• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL  ENGINE  AIR  INLET FAIRING (Continued) - TM-55-1520-240-23-3_561
INSTALL ENGINE  AIR INLET FAIRING

TM-55-1520-240-23-3 CH-47D Heilcopter Manual
Page Navigation
  527    528    529    530    531  532  533    534    535    536    537  
TM  55-1520-240-23-3 4-75 INSTALL  ENGINE  AIR  INLET FAIRING (Continued) 4-75 9. Connect  hose  (30)  to  port  (31)  on  transmission (10).   Remove  tag. 10. Connect  hose  (32)  to  port  (33).  Remove  tag. 11. Connect  hose  (34)  to  port  (35).  Remove  tag. 12. Connect  cable  plug  (36). 13. Position  clamp  (37)  with  temperature  and  chip detector  wiring  (38)  against  clip  (39)  on  lower lifting  lug  (40).  Install  screw  (41)  and  nut  (42). FOLLOW-ON  MAINTENANCE: Install  engine  drive  shaft  (Task  6-32). Install  engine  transmission  fairing  (Task 4-73). Install  engine  air  inlet screens  (Task 4-76). Perform  operational  check  of  gas  producer  control system  (TM  55-1520-240-T). Perform  operational  check  of  power  turbine  control system  (TM  55-1520-240-T). Close  engine  side  and  cover  access  covers  (Task 4-50). Close  engine  work  platform  (Task 2-2). Perform  initial  run-up  (Task 4-4). Check  powerplant plumbing  for  leaks. Check  forward  engine  mounts  for  proper  clearance after  four  hours  of  flight. Perform  operational  check  of  engine  oil  low  level warning  system  (TM  55-1520-240-T). Retorque  exhaust  cone  coupling  nuts  after  initial ground  run. END  OF  TASK 4-324







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.