• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL CONNECTING LINK (DRAG STRUT) (Continued)
ADJUST ENGINE  FIREWALL AND  ENGINE  COVER  FORMER

TM-55-1520-240-23-3 CH-47D Heilcopter Manual
Page Navigation
  443    444    445    446    447  448  449    450    451    452    453  
TM  55-1520-240-23-3 4-43 INSTALL  CONNECTING LINK (DRAG STRUT) (Continued) 4-43 9. Torque  nut  (6)  on  aft  end  of  link  (1)  to  350 inch-pounds. NOTE Ensure  flats on  bolt (10)  head  remain aligned  with  flats  on  link  (1)  while torquing  nut  (11). 10. Torque  nut  (11)  on  forward  end  of  link  (1)  to  105 inch-pounds. INSPECT FOLLOW-ON  MAINTENANCE: Install  powerplant  (Task  4-13). END  OF  TASK 4-236







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.