TM 55-1520-240-23-3
4-13
INSTALL POWERPLANT (Continued)
4-13
21.
Disconnect three cables (9 and 11) from
powerplant (2).
22.
Lift sling (T134), with cables (9 and 11), away
from powerplant (2). Remove cables from hoist
(17).
23.
Remove rope guide lines (5).
24.
Connect hose (32) to port (33) in transmission
(1). Remove tag from hose.
25.
Connect hose (34) to port (35). Remove tag from
hose.
26.
Connect hose (36) to port (37). Remove tag from
hose.
27.
Connect cable plug (38) to temp switch (38.2).
Tighten strain relief (38.1) to properly secure
cable to plug.
27.1. Connect cable plug to remote connector (38.3)
for transmission chip detector.
4-112
Change 1