TM 55-1520-240-23-3
4-12
ASSEMBLE POWERPLANT
(Continued)
4-12
45.
Position hose (54) on powerplant (1) and install
six clamps (55). Install two screws (56) and two
nuts (57). Install and lockwire screw (58). Use
lockwire (E231). Remove tag.
46.
Install serviceable gasket (59) on starter drive
housing (60). Position hose (54) on housing
and install two nuts (61) and two washers (62).
Remove tag.
47.
Position starter drain hose (63) on powerplant
(1). Install four clamps (64) and install two
screws (65) and two nuts (66). Remove tag and
tape from hose.
4-104