TM 55-1520-240-23-3
4-12
ASSEMBLE POWERPLANT
(Continued)
4-12
26.
Position two hoses (67 and 68) on powerplant.
27.
Install six clamps (69) on two hoses (67 and 68).
28.
Install one screw (70), one spacer (71), and one
nut (72). Remove tags and tape from hoses (67
and 68).
29.
Install three screws (29) into three clamps (69)
and three nuts (31). Remove tags and tape from
hoses (67 and 68).
4-100