• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
DISASSEMBLE  FORWARD LANDING GEAR (Continued)
ASSEMBLE  FORWARD  LANDING  GEAR (Continued)

TM-55-1520-240-23-3 CH-47D Heilcopter Manual
Page Navigation
  9    10    11    12    13  14  15    16    17    18    19  
TM  55-1520-240-23-3 3-5 ASSEMBLE  FORWARD  LANDING GEAR 3-5 INITIAL  SETUP Applicable  Configurations: All Tools: Aircraft Mechanic’s  Tool  Kit,  NSN  5180-00-323-4692 Tiedown  Chain Materials: Lockwire  (E231) Personnel  Required: Medium  Helicopter Repairer Inspector References: Task  2-18 Task  3-12 Task  3-15 Task  3-26 Task  3-83 TM  55-1520-240-23P Equipment  Condition: Off  Helicopter  Task NOTE Procedure  is  same  for  left  and  right gear.  Left gear  is shown  here. If  a  replacement  gear  is  being installed, drain  preservative  fluid  from shock  strut. 1. Remove  lockwire  and  filler  plug  (1).  Turn  shock strut (2) upside  down  to  drain  fluid  from strut. 2. Install  torque  arm  (3) (Task  3-18). 3. Install  two  clamps  (4) with  nuts  (5).  Safety  wire nuts with  lockwire  (E231). 4. Install  both  axles  (6) (Task  3-15). 5. Install  both  brakes (7)  (Task 3-83). 6. Install  tube  (8) in  brake  (7). 7. Install  both  wheels (9)  (Task 3-12). 8. Install  shackle  (10)  (Task 3-26). 3-16







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.