TM 55-1520-240-23-3
4-6
CHECK ENGINE AFTER EXCESSIVE G-FORCE LOAD
(Continued)
4-6
6.
Check fuel control (8) for cracked flanges.
7.
Check security of all hose connections on
powerplant (9).
8.
Check security of hardware on powerplant (9).
FOLLOW-ON MAINTENANCE:
Close engine access cover (Task 4-50).
Close engine work platform (Task 2-2).
END OF TASK
4-38