TM 55-1520-240-23-10
13-49
INSTALL HEATER FUEL SOLENOID VALVE
(Continued)
13-49
3.
Position valve (2) on bracket (6), arrow (3)
forward.
4.
Install two bolts (7) and washers (8).
5.
Remove plugs and connect two fuel hoses (9).
6.
Connect electrical connector (10) to valve (2).
7.
Lockwire (E231) connector (10) to valve (2).
INSPECT
FOLLOW-ON MAINTENANCE:
Close right aft intertank access door (Task 2-2).
Perform operational check (TM 55-1520-240-T).
END OF TASK
13-153