• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
1-69 SERVICE FORWARD LANDING GEAR SHOCK STRUT (FLUID) (Continued) - TM-55-1520-240-23-1_289
1-69 SERVICE FORWARD LANDING GEAR SHOCK STRUT (FLUID) (Continued) - TM-55-1520-240-23-1_291

TM-55-1520-240-23-1 UH-1H/V and EH-1H Aircraft Manual
Page Navigation
  252    253    254    255    256  257  258    259    260    261    262  
TM  55-1520-240-23-1 1-69 SERVICE FORWARD  LANDING GEAR SHOCK STRUT (FLUID) (Continued) 1-69 3. Remove  aft  plug  (2).   Hold  air chuck  (3)  from source  of  compressed  air  over open  port  (4). Pressurize  strut  (5) through  port  at  50  to 100 psi  for  5 seconds. 4. Remove  forward  plug  (1). 5. Hand-fill  strut  (5)  with  hydraulic  fluid  (E197) through  aft  port (4).   Fill  until  bubble-free  fluid begins  to  flow from  forward  port  (6). 6. Coat new packing  (7) with  hydraulic  fluid  (E197). Install  packing  on  plug  (1).  Install  plug  in  forward port  (6). 7. Continue  to  fill  strut (5) through  aft port  (4)  until port  is filled  with  bubble-free  fluid. 8. Coat new packing  (8) with  hydraulic  fluid  (E197). Install  packing  on  plug  (2).  Install  plug  in  aft  port (4). 9. Remove  cloths, if  used.  Clean  fluid  from  strut  as needed.   Use  cloths  (E120). 1-263







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.